Carolina Green converted the existing playing field at Maryville College to a modified soil Cambridge drainage field. We stripped the existing sod and organic layer, lasergraded the subgrade, installed compost and tilled into the soil profile, installed collector pipe and laterals for drainage system, installed irrigation system, installed sand cap, and installed Bermuda sod.
Scroll through Our projects
Placeholder