Demo existing area outside of playing field area. Move underground utilities as needed. Pour and place concrete curb. Install new synthetic turf and repair natural turf up to synthetic turf area.
Carolina Green stripped and replaced sod on two fields at the Under Armor Performance Center for the Baltimore Ravens. We installed Northbridge Bermuda GameOn Grass.
This project was an emergent sod replacement. The day after the Army vs. Navy football game 2016, we stripped out the Army/Navy logos painted in the endzones and replaced them with fresh GameOn Grass. The Ravens grounds crew got to work painting the Ravens logos and the field was ready for the next game in less than 48 hours!
This job took place at Baltimore Ravens game field; M&T Bank Stadium. The job consisted of stripping out and replacing 27,300sf of sod. Sod was replaced with Tifway 419 Bermuda GameOn Grass overseeded with perennial rye.